CSV • CSA • Part 11 • Data Integrity
Computerized Systems Validation & Assurance
Regulated organizations run on software — MES, LIMS, ERP, eQMS, CDS, historians, equipment controls and an expanding layer of cloud and AI services. Assurance work should be proportionate to how a system failure would affect product quality, patient or user safety, and the integrity of regulated records.
A risk-based assurance framework
Intended use drives everything. Two organizations can run the same software and legitimately arrive at different assurance approaches because the system supports different decisions and different records.
A workable framework establishes intended use, assesses risk against that use, selects assurance activities proportionate to the risk, and records the evidence and the reasoning. Critical thinking is the deliverable; documents are the residue.
- Define intended use and system boundaries
- Classify the system and identify high-risk functions
- Select assurance activities — unscripted, scripted, or a combination
- Establish requirements and traceability where risk warrants it
- Leverage supplier activities where the supplier has been assessed
- Record results, defects and the release decision
Lifecycle controls after go-live
Most inspection findings involve the operational phase, not the initial project. Access control drifts, audit trails stop being reviewed, changes are made without impact assessment, and periodic review is deferred until an audit forces it.
- Change control and configuration management
- Access management and periodic user access review
- Audit trail review procedures with defined frequency and scope
- Backup, restore and business continuity verification
- Incident and deviation handling
- Periodic review with documented conclusions
- Decommissioning and record retention/migration
Supplier assessment and leveraging vendor work
Suppliers do meaningful quality work. Leveraging it is legitimate and encouraged where the supplier's development, testing and release practices have been assessed and the assessment is documented. What cannot be delegated is the regulated organization's responsibility for the system as configured and used in its own environment.
Legacy systems
Legacy systems rarely have complete documentation. A defensible path is a documented gap assessment against current expectations, risk-ranked remediation, compensating controls where technical fixes are not feasible, and a retirement or replacement plan where the residual risk cannot be reduced.
Primary references
- FDA — Process Validation: General Principles and Practices
- FDA — Computer Software Assurance for Production and Quality System Software
- FDA — 21 CFR Part 11, Electronic Records; Electronic Signatures
- FDA — Data Integrity and Compliance With Drug CGMP
- FDA — General Principles of Software Validation
Information published on ValidationEngineering.com is educational and informational. It is not legal or regulatory advice and is not a guarantee of regulatory compliance or of any inspection outcome. Organizations remain responsible for their own quality decisions.
Next step
Need computerized systems assurance support?
Describe the systems, the regulatory context and where you are in the lifecycle.
